The movie displays the transport of a HLW waste canister to its resting place in an emplacement tunnel.
In the initial seconds this is represented by an orange dot moving down the main access ramp.
Once in the transition tunnel, the locomotives pass the canister to the remote electrical locomotive.
The electrical locomotive transports the canister to the emplacement tunnel where it is transferred onto the emplacement trolley.
The emplaced canister is backfilled with bentonite.
Requires FlashPlayer8 |